Home › New York City, NY › ZIP 10039
Building permits in 10039 — New York City, NY
Foundation · 4 Remodeling · 3 Demolition · 1 New Construction · 1
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-13 | 2931 8 AVENUE, Manhattan · 10039 | FILING FOR STRUCTURAL WORK IN CONJUNCTION WITH MODIFICATIONS TO EXISTING COMPACTOR ROOM FOR THE INSTALLATION OF A PNEUMATIC WASTESYSTEM AND COLLECTION ROOM. NO CHANGE TO USE EGRESS Foundation | $50,000 | › |
| 2026-11-13 | 2989 FRED DOUGLASS BOULEVARD, Manhattan · 10039 | FILING FOR STRUCTURAL WORK IN CONJUNCTION WITH MODIFICATIONS TO EXISTING COMPACTOR ROOM FOR THE INSTALLATION OF A PNEUMATIC WASTESYSTEM AND COLLECTION ROOM. NO CHANGE TO USE EGRESS Foundation | $50,000 | › |
| 2026-11-10 | 2533 ADAM CLAYTON POWELL BOULEVARD, Manhattan · 10039 | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.THE SIDEWALK SHED AR ADAM CLAYTON POWELL BOULEVARD IN FRONT OF THE BUILDING. | $1 | › |
| 2026-11-10 | 2537 ADAM CLAYTON POWELL BOULEVARD, Manhattan · 10039 | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.THE SIDEWALK SHED AT ADAM CLAYTON POWELL BLVD IN FRONT OF THE BUILDING. | $1 | › |
| 2026-11-10 | 2529 ADAM CLAYTON POWELL BOULEVARD, Manhattan · 10039 | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED IS AT ADAM CLAYTON POWELL BLVD IN FRONT OF THE BUILDING. | $1 | › |
| 2026-11-10 | 2525 ADAM CLAYTON POWELL BOULEVARD, Manhattan · 10039 | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.THE SIDEWALK SHED AT ADAM CLAYTON POWELL BLVD IN FRONT OF THE BUILDING. | $1 | › |
| 2026-11-06 | 222 WEST 145 STREET, Manhattan · 10039 | RENOVATION OF EXISTING 2-STORY COMMERCIAL BUILDING INTO ONE RETAIL ESTABLISHMENT. NO BUILDING ENLARGEMENTS PROPOSED. Remodeling | $612,660 | › |
| 2026-11-06 | 68 BRADHURST AVENUE, Manhattan · 10039 | inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe | — | › |
| 2026-11-05 | 222 WEST 145 STREET, Manhattan · 10039 | Demo + Structural Alteration RemodelingDemolitionFoundation | $255,275 | › |
| 2026-11-05 | 222 WEST 145 STREET, Manhattan · 10039 | Foundations for alterations RemodelingFoundation | $35,000 | › |
| 2026-11-04 | 70 MACOMBS PLACE, Manhattan · 10039 | ALT-CO FOR HARLEM HOUSES BLDG 1 (70 MACOMBS PL) FILED IN CONJ. WITH ALTCO M00674682-I1 FILED FOR HARLEM HOUSES BLDG 2 TO: 1) CREATE 2 SEPARATE CERTIFICATES OF OCCUPANCY;AND 2) REFL | $1,080 | › |
| 2026-11-04 | 2650 ADAM CLAYTON POWELL BOULEVARD, Manhattan · 10039 | ALTCO FOR HARLEM HOUSES BLDG 2 FILED IN CONJ. WITH ALTCO M00677604 FILED FOR HARLEM HOUSES BLDG 1 TO:1)CREAT 2 SEPARATE CO;2)REFLECT CHANGE USE AND OCCUPANCY OF FORMER PUBLIC LIBRA New Construction | $150,000 | › |
Every permit issued in ZIP 10039 — each one an active project at a specific address. Public records, refreshed daily.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.