Home › New York City, NY › Permit
Remodeling permit at 31-08 STEINWAY STREET, Queens
Remodeling
Work description
RENOVATE 1ST FLOOR AND CELLAR FOR NEW RETAIL USE. NEW EGRESS STAIR FROM CELLAR, NEW BATHROOMS, AND STOREFRONT ON THE 1ST FLOOR. REMOVE EXISTING 2ND FLOOR AND 2ND FLOOR MEZZANINE. RELATED APPLICATION INFORMATION INDICATED IN THE COMMENTS BOX BELOW.
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-10 | 31-08 STEINWAY STREET, Queens · 11103 | INTERIOR TENANT FIT OUT FOR RETAIL STORE INCLUDING NEW INTERIOR PARTITION WALLS, NEW FIXTURES, AND FINISHES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHAGNE OR OCCUPANCY, USE OR EGRE | $662,640 | › |
| 2026-11-10 | 31-08 STEINWAY STREET, Queens · 11103 | INSTLLATION OF NEW DUCTEORK, AIR DEVICES AND CONTROLS CONNECTED TO ROOFTOP UNUTS, INSTALLATION OF NEW EXHAUST FANS ABOVE TENTNAT RESTROOM AS SHOWN ON DRAWNGS FILED HERWITH. NO CHAN RoofingHVAC | $138,531 | › |
| 2026-10-30 | 31-08 STEINWAY STREET, Queens · 11103 | ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING OLD NAVY | $26,793 | › |
| 2026-10-27 | 31-08 STEINWAY STREET, Queens · 11103 | Modification of Sprinkler systems as shown on drawings filed herewith. No change to occupancy, sue or egress. | $40,748 | › |
| 2026-09-25 | 31-08 STEINWAY STREET, Queens · 11103 | Installation of new plumbing fixtures, domestic water and sanitary systems, rough-ins, and Modification or existing rough-ins and plumbing piping work as shown on drawings filed he Plumbing | $48,519 | › |
| 2026-09-08 | 31-08 STEINWAY STREET, Queens · 11103 | (PHASE 2) - RESTORATION OF INTERIOR MASONARY WALLS. SUPPORT OF NEW ROOFTOP UNITS. RAISE FIRST FLOOR CEILING. ADDITION OF STAIR CASE FROM THE CELLAR TO FIRST FLOOR. FIRST FLOOR SLAB RoofingRemodeling | $1,225,000 | › |
| 2026-08-05 | 31-08 STEINWAY STREET, Queens · 11103 | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. Fencing | $1 | › |
| 2026-07-27 | 31-08 STEINWAY STREET, Queens · 11103 | PARTIAL, NON-MECHANICAL, DEMOLITION OF PORTIONS OF THE EXISTING 2ND FLOOR. Demolition | $285,000 | › |
| 2026-07-23 | 31-08 STEINWAY STREET, Queens · 11103 | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $1 | › |
| 2026-07-22 | 31-08 STEINWAY STREET, Queens · 11103 | MODIFICATION AND INSTALLATION OF SPRINKLER HEADS. | $382,000 | › |
| 2026-07-21 | 31-08 STEINWAY STREET, Queens · 11103 | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $1 | › |
| 2026-07-20 | 31-08 STEINWAY STREET, Queens · 11103 | INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. RoofingHVAC | $4,000 | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.