Home › New York City, NY › Permit
HVAC permit at 143-22 84 ROAD, Queens
HVAC
Work description
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW BUILDING. . FILED IN CONJUNCTION WITH NEW BUILDING, DOB NOW # Q01234060-I1.
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-17 | 143-22 84 ROAD, Queens · 11435 | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE I | — | › |
| 2026-11-06 | 143-22 84 ROAD, Queens · 11435 | Structural drawings for 8 story new building with cellar. | — | › |
| 2026-11-06 | 143-22 84 ROAD, Queens · 11435 | Foundation drawings for 8 story new building with cellar. Foundation | — | › |
| 2026-11-04 | 143-22 84 ROAD, Queens · 11435 | NEW 7 STORY 62 DWELLING UNIT RESIDENTIAL BUILDING | — | › |
| 2026-11-04 | 143-22 84 ROAD, Queens · 11435 | Support of excavation drawings foe7 story Foundation | — | › |
| 2026-09-15 | 143-22 84 ROAD, Queens · 11435 | FILING NEW CURB CUT SUBSEQUENTLY UNDER NB APPLICATION #Q01234060-I1 | — | › |
| 2026-08-27 | 143-22 84 ROAD, Queens · 11435 | INSTALLATION OF PLUMBING FIXTURES AND PIPING FOR NEW 7 STORY RESIDENTIAL BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, DOB NOW # Q01234060-I1. Plumbing | — | › |
| 2026-08-27 | 143-22 84 ROAD, Queens · 11435 | HEREWITH FILING FOR COMBINATION STANDPIPE/SPRINKLER SYSTEM WITH FIRE PUMP, THROUGH-OUT NEW 7-STORY RESIDENTIAL NEW BUILDING. FILED IN CONJUNCTION WITH NB APPLICATION # Q01234060-I1 New Construction | — | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.