Home › New York City, NY › Permit
Building permit at 111 8 AVENUE, Manhattan
Contractor on record: CENTRAL CONSTRUCTION MGMT
Named on this permit by NYC Open Data (DOB NOW) · 70 permits tracked since 2026-07-27.
View full contractor profile →Work description
INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS
More from CENTRAL CONSTRUCTION MGMT
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-16 | 301 EAST 61 STREET, Manhattan · 10065 | INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE MEANS OF EGRESS. | — | › |
| 2026-11-16 | 825 THIRD AVENUE, Manhattan · 10022 | INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE MEANS OF EGRESS. | — | › |
| 2026-11-10 | 184 KENT AVENUE, Brooklyn · 11249 | INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE MEANS OF EGRESS. | — | › |
| 2026-11-10 | 829 PARK AVENUE, Manhattan · 10021 | INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE MEANS OF EGRESS. | — | › |
| 2026-11-10 | 41 BOND STREET, Manhattan · 10012 | INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE MEANS OF EGRESS. | — | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-10-13 | 111 8 AVENUE, Manhattan · 10011 | SIDEWALK SHED FOR PROTECTION OF PUBLIC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $300,000 | › |
| 2026-09-14 | 111 8 AVENUE, Manhattan · 10011 | Filing for installation of plumbing fixtures and related piping as per plans filed herewith. Filing for modifications to existing Sprinkler system as per plans filed herewith. No c Plumbing | $375,000 | › |
| 2026-09-14 | 111 8 AVENUE, Manhattan · 10011 | Modifications to plumbing fixtures and related piping as per plans filed herewith. Modifications to existing Sprinkler system and related piping as per plans filed herewith. Reloca Plumbing | $350,000 | › |
| 2026-08-24 | 111 8 AVENUE, Manhattan · 10011 | INSTALLATION OF A TEMPORARY SCAFFOLD IN THE SHAFT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC BUILDING CODE. | $5,000 | › |
| 2026-08-13 | 111 8 AVENUE, Manhattan · 10011 | FILING FOR REMOVAL OF (3) AC UNITS AND INSTALLATION OF (3) FCUS AND ASSOCIATED DUCTS AND PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. HVAC | $360,000 | › |
| 2026-08-04 | 111 8 AVENUE, Manhattan · 10011 | FILING FOR INSTALLATION OF NEW PLUMBING FIXTURES, EQUIPMENT CONNECTIONS, DRAINAGE, VENTING, WATER DISTRIBUTION, AND APPURTENANCES. FILING FOR MODIFICATIONS TO EXISTING SPRINKLER SY Plumbing | $450,000 | › |
| 2026-07-30 | 111 8 AVENUE, Manhattan · 10011 | INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $4,000,000 | › |
| 2026-07-27 | 111 8 AVENUE, Manhattan · 10011 | REMOVAL OR REFURBISHMENT OF EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. REMOVAL OF EXISTING SPRINKLER HEADS, BRANCH LINES, AND ASSOCIATED FITTINGS Plumbing | $70,000 | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.