Fencing permit at 435 HUDSON STREET, Manhattan
Fencing
Contractor on record: STARR INDUSTRIES LLC
Named on this permit by NYC Open Data (DOB NOW) · 46 permits tracked since 2026-07-27 · $523,017 total declared value.
View full contractor profile →Work description
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
More from STARR INDUSTRIES LLC
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-12 | 2231 BATCHELDER STREET, Brooklyn · 11229 | INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AT NYCHA HOUSING BUILDING #2 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC | $5,000 | › |
| 2026-11-12 | 3022 AVENUE V, Brooklyn · 11229 | INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AT NYCHA HOUSING BUILDING #3 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC | $5,000 | › |
| 2026-11-12 | 1000 5 AVENUE, Manhattan · 10028 | INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. OVERHEAD PROTECTION SHALL HVAC | $5,000 | › |
| 2026-11-12 | 31-01 20 AVENUE, Queens · 11105 | INSTALLATION OF A HEAVY DUTY SIDEWALK SHED @ BLDG. 136 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH 2022 NYC BUILDING | $5,000 | › |
| 2026-11-09 | 2241 BATCHELDER STREET, Brooklyn · 11229 | INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AT NYCHA HOUSING BUILDING #1 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF 2022 NYC | $5,000 | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-06 | 435 HUDSON STREET, Manhattan · 10014 | inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco | — | › |
| 2026-10-21 | 435 HUDSON STREET, Manhattan · 10014 | Provide metered domestic water to work area; install piping on the Cellar and 1st Floor as per plans (Hines - Storefront Phase 2.) No change in use, egress or occupancy. Plumbing | $35,000 | › |
| 2026-10-21 | 435 HUDSON STREET, Manhattan · 10014 | Relocate (10) existing sprinkler heads and associated piping to accommodate lower slab height on the Cellar Level as per plans (Hines Storefront - Phase 2.) No change to use, egres | $12,000 | › |
| 2026-10-07 | 435 HUDSON STREET, Manhattan · 10014 | Filing for installation of mechanical units for restaurant space on the first floor, in association with general construction application # M01213438-I1. HVAC | $255,000 | › |
| 2026-09-29 | 435 HUDSON STREET, Manhattan · 10014 | Structural modifications: Recessing two bays of slab at the 1st Floor to accommodate a stair and an ADA ramp on the 1st Floor as per plans (Hines - Storefront Phase 2.) No change t Foundation | $150,000 | › |
| 2026-08-13 | 435 HUDSON STREET, Manhattan · 10014 | Minor interior demolition; Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 7th floor as per plans (Hines - Demo, Whitebox & Stair I Demolition | $217,389 | › |
| 2026-08-13 | 435 HUDSON STREET, Manhattan · 10014 | Minor interior construction, patching and repair of finishes in tenant spaces on the Cellar-9th and Roof as per plans (Hines Fire Alarm System Upgrade.) No change to use, egress or Roofing | $400,000 | › |
| 2026-08-13 | 435 HUDSON STREET, Manhattan · 10014 | Minor demolition. Installation of new exterior storefront, windows, exterior door, interior stair and ADA access ramp on the Cellar and 1st floors as per plans (Storefront Phase 2. DemolitionWindows & Doors | $583,000 | › |
| 2026-08-13 | 435 HUDSON STREET, Manhattan · 10014 | Modifications to existing HVAC System: Remove, relocate and reinstall exiting ductwork and infrastructure to accommodate interior renovations on the Cellar and 1st Floor as per pla HVACRemodeling | $35,000 | › |
| 2026-08-12 | 435 HUDSON STREET, Manhattan · 10014 | Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab in HVACDemolition | $6,426 | › |
| 2026-08-12 | 435 HUDSON STREET, Manhattan · 10014 | Minor interior demolition, removal of interior non-load bearing partitions and finishes on the 1, 2, 5th and Roof as per plans (Hines Demo & Whitebox.) No change to use, egress or RoofingDemolition | $599,926 | › |
| 2026-08-12 | 435 HUDSON STREET, Manhattan · 10014 | Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 1, 2, 5, 8, Roof as per plans (Demo & Whitebox.) No change in use, egres RoofingHVACDemolition | $26,853 | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.