Home › New York City, NY › Permit
Plumbing permit at 435 HUDSON STREET, Manhattan
Plumbing
Work description
Provide metered domestic water to work area; install piping on the Cellar and 1st Floor as per plans (Hines - Storefront Phase 2.) No change in use, egress or occupancy.
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-06 | 435 HUDSON STREET, Manhattan · 10014 | inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco | — | › |
| 2026-10-21 | 435 HUDSON STREET, Manhattan · 10014 | Relocate (10) existing sprinkler heads and associated piping to accommodate lower slab height on the Cellar Level as per plans (Hines Storefront - Phase 2.) No change to use, egres | $12,000 | › |
| 2026-10-07 | 435 HUDSON STREET, Manhattan · 10014 | Filing for installation of mechanical units for restaurant space on the first floor, in association with general construction application # M01213438-I1. HVAC | $255,000 | › |
| 2026-09-29 | 435 HUDSON STREET, Manhattan · 10014 | Structural modifications: Recessing two bays of slab at the 1st Floor to accommodate a stair and an ADA ramp on the 1st Floor as per plans (Hines - Storefront Phase 2.) No change t Foundation | $150,000 | › |
| 2026-08-13 | 435 HUDSON STREET, Manhattan · 10014 | Minor interior demolition; Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 7th floor as per plans (Hines - Demo, Whitebox & Stair I Demolition | $217,389 | › |
| 2026-08-13 | 435 HUDSON STREET, Manhattan · 10014 | Minor interior construction, patching and repair of finishes in tenant spaces on the Cellar-9th and Roof as per plans (Hines Fire Alarm System Upgrade.) No change to use, egress or Roofing | $400,000 | › |
| 2026-08-13 | 435 HUDSON STREET, Manhattan · 10014 | Minor demolition. Installation of new exterior storefront, windows, exterior door, interior stair and ADA access ramp on the Cellar and 1st floors as per plans (Storefront Phase 2. DemolitionWindows & Doors | $583,000 | › |
| 2026-08-13 | 435 HUDSON STREET, Manhattan · 10014 | Modifications to existing HVAC System: Remove, relocate and reinstall exiting ductwork and infrastructure to accommodate interior renovations on the Cellar and 1st Floor as per pla HVACRemodeling | $35,000 | › |
| 2026-08-12 | 435 HUDSON STREET, Manhattan · 10014 | Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab in HVACDemolition | $6,426 | › |
| 2026-08-12 | 435 HUDSON STREET, Manhattan · 10014 | Minor interior demolition, removal of interior non-load bearing partitions and finishes on the 1, 2, 5th and Roof as per plans (Hines Demo & Whitebox.) No change to use, egress or RoofingDemolition | $599,926 | › |
| 2026-08-12 | 435 HUDSON STREET, Manhattan · 10014 | Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 1, 2, 5, 8, Roof as per plans (Demo & Whitebox.) No change in use, egres RoofingHVACDemolition | $26,853 | › |
| 2026-07-31 | 435 HUDSON STREET, Manhattan · 10014 | INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING COD Fencing | $31,000 | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.