Home › New York City, NY › Permit
Building permit at 360 PARK AVENUE SOUTH, Manhattan
Contractor on record: TRI-STAR CONSTRUCTION COR
Named on this permit by NYC Open Data (DOB NOW) · 58 permits tracked since 2026-07-27 · $67,024,421 total declared value.
View full contractor profile →Work description
INTERIOR TENANT IMPROVEMENTS, WORK TO INCLUDE NEW INTERCONNECTING STAIR AND FINISHES, NON-LOADBEARING PARTITIONS AND FINISHES AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
More from TRI-STAR CONSTRUCTION COR
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-19 | 100 WEST 33 STREET, Manhattan · 10001 | Interior renovation as per plans filed herewith. No change of use, occupancy, or egress Remodeling | $7,000,004 | › |
| 2026-11-19 | 100 WEST 33 STREET, Manhattan · 10001 | Modification to Mechanical Systems as per plans filed herewith HVAC | $1,812,270 | › |
| 2026-11-18 | 40 WEST 57 STREET, Manhattan · 10019 | HVAC WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. HVAC | $75,000 | › |
| 2026-11-16 | 40 WEST 57 STREET, Manhattan · 10019 | Comprehensive interior tenant alteration and fit-out of the entire single-tenant commercial office floors 030 (031M), 031 (032M), 032 (033M) to accommodate a corporate office spac Remodeling | $7,904,985 | › |
| 2026-11-16 | 40 WEST 57 STREET, Manhattan · 10019 | Mechanical scope involves major office layout reconfiguration on floors 030C (031M), 031C (032M), 032C (033M). No change in use, egress or occupancy. HVAC | $1,119,855 | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-16 | 360 PARK AVENUE SOUTH, Manhattan · 10010 | Sprinkler modifications and installation of temp loop on floors 2-5 as per plans filed herewith, tied to pre-action fire alarm system on 4th floor. No changes in use, egress or occ | $707,736 | › |
| 2026-11-16 | 360 PARK AVENUE SOUTH, Manhattan · 10010 | Standpipe modifications on floors 2-5 as per plans filed herewith. No changes in use, egress or occupancy. | $120,000 | › |
| 2026-10-28 | 360 PARK AVENUE SOUTH, Manhattan · 10010 | General construction associated with tenant interior alterations on floors 2-5, including critical infrastructure work in sub-cellar, basement, 1st and roof as per plans filed here RoofingRemodeling | $14,248,548 | › |
| 2026-10-28 | 360 PARK AVENUE SOUTH, Manhattan · 10010 | Mechanical modifications on floors 2-5 and Roof as per plans filed herewith. No changes in use, egress or occupancy. RoofingHVAC | $4,456,336 | › |
| 2026-10-13 | 360 PARK AVENUE SOUTH, Manhattan · 10010 | Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy. PlumbingRemodeling | $100,000 | › |
| 2026-10-13 | 360 PARK AVENUE SOUTH, Manhattan · 10010 | Modification/addition to plumbing fixtures and related piping as show on drawings. No change in use, egress or occupancy. PlumbingRemodeling | $100,000 | › |
| 2026-10-13 | 360 PARK AVENUE SOUTH, Manhattan · 10010 | Installation of temporary core sprinkler protection as shown on drawings. No change in use, egress or occupancy. | $2,500 | › |
| 2026-10-08 | 360 PARK AVENUE SOUTH, Manhattan · 10010 | Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy. HVACRemodeling | $500,000 | › |
| 2026-10-02 | 360 PARK AVENUE SOUTH, Manhattan · 10010 | Removal and construction of interior partition, doors and ceiling as shown on drawings. No change in use, egress or occupancy. | $2,100,000 | › |
| 2026-10-01 | 360 PARK AVENUE SOUTH, Manhattan · 10010 | Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy. PlumbingRemodeling | $460,000 | › |
| 2026-10-01 | 360 PARK AVENUE SOUTH, Manhattan · 10010 | PROPOSED: INSTALLATION OF TEMPORARY SPRINKLER LOOP FOR 15TH FLOOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY, | $10,000 | › |
| 2026-09-29 | 360 PARK AVENUE SOUTH, Manhattan · 10010 | FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola | — | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.