Foundation permit at 825 THIRD AVENUE, Manhattan
Foundation
Contractor on record: CLUNE CONSTRUCTION CO LP
Named on this permit by NYC Open Data (DOB NOW) · 130 permits tracked since 2026-07-27 · $99,281,799 total declared value.
View full contractor profile →Work description
Structural work for new raised slab on 1st floor for west retail space.
More from CLUNE CONSTRUCTION CO LP
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-16 | 600 LEXINGTON AVENUE, Manhattan · 10022 | Filing herewith drawings indicating modification of the Mechanical system on the 12th floor. No change in use, egress, or occupancy under this application. HVAC | $361,494 | › |
| 2026-11-12 | 1 PENN PLAZA, Manhattan · 10119 | Mechanical work on the 53rd floor (prebuild) as indicated on drawings. HVAC | $31,985 | › |
| 2026-11-12 | 90 PARK AVENUE, Manhattan · 10016 | Architectural changes on the 26th floor as indicated on drawings. | $1,207,018 | › |
| 2026-11-10 | 605 THIRD AVENUE, Manhattan · 10158 | General Construction to take place on the 4th Construction floor as per drawings filed herewith. No change in use, egress, or occupancy. | $321,000 | › |
| 2026-11-09 | 90 PARK AVENUE, Manhattan · 10016 | Mechanical changes on the 26th floor as indicated on drawings. HVAC | $59,850 | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-16 | 825 THIRD AVENUE, Manhattan · 10022 | INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE MEANS OF EGRESS. | — | › |
| 2026-11-13 | 825 THIRD AVENUE, Manhattan · 10022 | Addition of (2) fire hose valves to existing standpipe system. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Remodeling | $30,000 | › |
| 2026-11-13 | 825 THIRD AVENUE, Manhattan · 10022 | Addition of (1) fire hose valves to existing standpipe system. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Remodeling | $15,000 | › |
| 2026-10-28 | 825 THIRD AVENUE, Manhattan · 10022 | Modification to existing sprinkler system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy. Plumbing | $700,332 | › |
| 2026-10-28 | 825 THIRD AVENUE, Manhattan · 10022 | Modification to existing sprinkler system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy. Plumbing | $468,831 | › |
| 2026-10-21 | 825 THIRD AVENUE, Manhattan · 10022 | Sprinkler work for Sodali on 27th marketing floor (26th construction) | $47,955 | › |
| 2026-10-20 | 825 THIRD AVENUE, Manhattan · 10022 | Plumbing work for Sodali on 27th marketing floor (26th construction) Plumbing | $33,982 | › |
| 2026-10-19 | 825 THIRD AVENUE, Manhattan · 10022 | Interior demolition and construction for Sodali on 27th marketing floor (26th construction) Demolition | $575,028 | › |
| 2026-10-19 | 825 THIRD AVENUE, Manhattan · 10022 | Mechanical work for Sodali on 27th marketing floor (26th construction) HVAC | $249,952 | › |
| 2026-10-14 | 825 THIRD AVENUE, Manhattan · 10022 | Interior demolition and general construction for WEF Welcome Center on 1st floor Demolition | $48,999 | › |
| 2026-10-14 | 825 THIRD AVENUE, Manhattan · 10022 | Mechanical work for WEF Welcome Center on 1st floor HVAC | $49,994 | › |
| 2026-10-13 | 825 THIRD AVENUE, Manhattan · 10022 | Alteration, addition of (4) electric baseboard radiators, (7) supplemental water source heat pumps, associated ducts, and piping. No change to use, egress, or occupancy. HVACRemodeling | $1,820,915 | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.