Home › New York City, NY › Permit
Foundation permit at 885 THIRD AVENUE, Manhattan
Foundation
Contractor on record: STRUCTURAL PRESERV SYSTEM
Named on this permit by NYC Open Data (DOB NOW) · 39 permits tracked since 2026-07-27 · $103,778,554 total declared value.
View full contractor profile →Work description
GENERAL CONSTRUCTION & STRUCTURAL MODIFICATIONS TAKING PLACE ON FACADE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
More from STRUCTURAL PRESERV SYSTEM
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-10 | 200 EAST 57 STREET, Manhattan · 10022 | Installation of a temporary access ramp to provide safe access. HVAC | $12,700 | › |
| 2026-11-10 | 200 EAST 57 STREET, Manhattan · 10022 | INSTALLATION OF CONSTRUCTION FENCE FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK. Filed in conjunction with M00774412-I1. Fencing | $10,000 | › |
| 2026-11-09 | 455 CARLTON AVENUE, Brooklyn · 11238 | Filing for Solar panel structural framing as per plans filed herewith. No change in use, occupancy or egress. SolarFoundation | $950,000 | › |
| 2026-11-09 | 770 FULTON STREET, Brooklyn · 11238 | Filing for solar panel structural framing as per plans filed herewith. No change in use occupancy or egress. SolarFoundation | $950,000 | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-10-29 | 885 THIRD AVENUE, Manhattan · 10022 | Plumbing Fixture changes as indicated on plans. Plumbing | $20,000 | › |
| 2026-10-28 | 885 THIRD AVENUE, Manhattan · 10022 | Sprinkler head changes as indicated on plans. | $19,999 | › |
| 2026-10-05 | 885 THIRD AVENUE, Manhattan · 10022 | MSK LIPSTICK INFRA: MODIFICATIONS TO HVAC DUCTWORK, PIPING AND EQUIPMENT TO ACCOMMODATE THE INFRASTRUCTURE PROJECT IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. HVAC | $367,500 | › |
| 2026-09-30 | 885 THIRD AVENUE, Manhattan · 10022 | Installation, removal, and modifications to plumbing fixtures and piping on the 32nd Floor (Dr Wiser Office), as per plans. No change to use, egress, or occupancy. Plumbing | $72,912 | › |
| 2026-09-30 | 885 THIRD AVENUE, Manhattan · 10022 | Modifications to the existing sprinkler system on the 32nd Floor (Dr. Wiser Office), as per plans. No change to use, egress, or occupancy. | $84,750 | › |
| 2026-07-31 | 885 THIRD AVENUE, Manhattan · 10022 | Mechanical changes as indicated on plans. HVAC | $149,940 | › |
| 2026-07-29 | 885 THIRD AVENUE, Manhattan · 10022 | Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans. Demolition | $706,500 | › |
| 2026-07-24 | 885 THIRD AVENUE, Manhattan · 10022 | Modification to existing HVAC system, including removal & installation of ductwork & piping, installation of VRF heat pump, replacement of diffusers, air outlets, dampers & control HVAC | $184,120 | › |
| 2026-07-17 | 885 THIRD AVENUE, Manhattan · 10022 | Interior renovation of existing office space on the 32nd Floor (Dr. Wiser Office), including the partitions, doors, ceilings, and finishes as per plans. No change to use, egress, o Remodeling | $217,650 | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.