Home › New York City, NY › Permit
Building permit at 375 MADISON AVENUE, Manhattan
Contractor on record: ABCO-PEERLESS SPRKLR CORP
Named on this permit by NYC Open Data (DOB NOW) · 106 permits tracked since 2026-07-27 · $28,744,011 total declared value.
View full contractor profile →Work description
Sprinkler/Standpipe work Floors 30-33.
More from ABCO-PEERLESS SPRKLR CORP
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-16 | 9 WEST 57 STREET, Manhattan · 10019 | SPRINKLER MODIFICATIONS TAKING PLACE ON 49TH FLOOR CONSTRUCTION (50TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $55,044 | › |
| 2026-11-13 | 825 THIRD AVENUE, Manhattan · 10022 | Addition of (2) fire hose valves to existing standpipe system. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Remodeling | $30,000 | › |
| 2026-11-13 | 825 THIRD AVENUE, Manhattan · 10022 | Addition of (1) fire hose valves to existing standpipe system. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Remodeling | $15,000 | › |
| 2026-11-12 | 1250 AVENUE OF THE AMERICAS, Manhattan · 10112 | SPRINKLER MODIFICATIONS ON THE 9TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $16,000 | › |
| 2026-11-12 | 9 WEST 57 STREET, Manhattan · 10019 | SPRINKLER MODIFICATIONS TAKING PLACE ON 49TH FLOOR CONSTRUCTION (50TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $65,043 | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-16 | 375 MADISON AVENUE, Manhattan · 10017 | Alteration-CO for changes in use, occupancy, and egress on floors sub-cellar, cellar, 1, 1M, 2-11, 18, & 19 as part of full building renovation. Changes to overall building Zoning Remodeling | $64,528,511 | › |
| 2026-11-16 | 375 MADISON AVENUE, Manhattan · 10017 | Sprinkler work Floors 12-13. | $128,371 | › |
| 2026-11-16 | 375 MADISON AVENUE, Manhattan · 10017 | Filing herewith sprinkler modifications on floors 42-43 as per plans. No change in use, occupancy, or egress under this application. | $254,281 | › |
| 2026-11-09 | 375 MADISON AVENUE, Manhattan · 10017 | THE FIRE PROTECTION SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OFEXISTING MEP SERVICES. THE SYSTEMS INCLUDE SPRINKLER PIPING, MAINS, SPRINKLER CONTROL VALVE Demolition | $1,213,563 | › |
| 2026-11-05 | 375 MADISON AVENUE, Manhattan · 10017 | Filing herewith for installation of Temporary Dry Standpipe for fire protection during ongoing demolition and construction as part of redevelopment project. Demolition | $2,500,000 | › |
| 2026-09-25 | 375 MADISON AVENUE, Manhattan · 10017 | Filing herewith General Construction for temporary conditions inclusive but not limited to partitions, doors, and hardware for interior non-structural debris removal through Madiso | $100,000 | › |
| 2026-09-22 | 375 MADISON AVENUE, Manhattan · 10017 | Filing herewith plumbing installations/modifications on floors 20 through 23 as per plans. No change in use, egress, or occupancy. Plumbing | $645,766 | › |
| 2026-09-22 | 375 MADISON AVENUE, Manhattan · 10017 | PLUMBING SCOPE OF WORK TO INCLUDE INSTALLATION OF NEW WORKPLACE PANTRY FIXTURES, APPLIANCES AND RESTROOM FIXTURES AS PART OF NEW FITOUT. Plumbing | $484,325 | › |
| 2026-09-22 | 375 MADISON AVENUE, Manhattan · 10017 | PLUMBING SCOPE OF WORK TO INCLUDE INSTALLATION OF NEW WORKPLACE PANTRYFIXTURES, APPLIANCES AND RESTROOM FIXTURES AS PART OF NEW FITOUT. Plumbing | $540,251 | › |
| 2026-09-22 | 375 MADISON AVENUE, Manhattan · 10017 | REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. IN-KIND REPLACEMENT OF TREADS AT EXISTING CONVENIENCE STAIRS. NO CH | $8,073,636 | › |
| 2026-09-14 | 375 MADISON AVENUE, Manhattan · 10017 | Filing herewith plumbing installations as per plans no floors 39 through 41. No change in use, occupancy, or egress proposed under this application. Plumbing | $469,825 | › |
| 2026-09-14 | 375 MADISON AVENUE, Manhattan · 10017 | Filing herewith plumbing scope for offices fit-out at 9th thru 11th floor as per plans. No change in use, occupancy, or egress proposed under this application Plumbing | $526,402 | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.