Home › New York City, NY › Permit
Remodeling permit at 97 BARCLAY STREET, Manhattan
Remodeling
Contractor on record: BENCHMARK BUILDERS LLC
Named on this permit by NYC Open Data (DOB NOW) · 34 permits tracked since 2026-07-27 · $37,615,415 total declared value.
View full contractor profile →Work description
Interior renovation of the Cellar (A Level), including ceilings, partitions, floors and finishes as per plans. No change to use, egress, or occupancy.
More from BENCHMARK BUILDERS LLC
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-18 | 5 BRYANT PARK, Manhattan · 10018 | Work includes a Public Assembly space for the 3rd floor with a total occupant load of 86 & a posted maximum occupancy of 338 for the full floor as per plans filed herewith. The rem | $196,432 | › |
| 2026-11-18 | 101 PARK AVENUE, Manhattan · 10178 | INSTALL NEW STEEL MEMBERS TO SUPPORT NEW MOVABLE PARTITION. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | — | › |
| 2026-11-10 | 101 PARK AVENUE, Manhattan · 10178 | Removal and installation of walls, doors, floor finishes and ceilings as per plans. No change to use, egress or occupancy. | $3,086,893 | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-09-28 | 97 BARCLAY STREET, Manhattan · 10007 | Modifications to HVAC system in BNY Lobby Level (1st Floor Entry) and atrium, including alteration to ducts and piping, and the addition of new units, as per plans. No change to us HVACRemodeling | $2,750,000 | › |
| 2026-09-11 | 97 BARCLAY STREET, Manhattan · 10007 | Modifications to the existing Sprinkler / Standpipe system on the BNY Lobby Level (1st Floor Entry) and atrium, as per plans. No change to use, egress, or occupancy. | $250,000 | › |
| 2026-09-10 | 97 BARCLAY STREET, Manhattan · 10007 | Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy. | $1,498,928 | › |
| 2026-08-24 | 97 BARCLAY STREET, Manhattan · 10007 | Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy. Foundation | $3,000,000 | › |
| 2026-08-20 | 97 BARCLAY STREET, Manhattan · 10007 | Structural work related to facade replacement as per plans. No change to use, egress, or occupancy. Related Job numbers: M01277287, M01283766 Foundation | $14,998,800 | › |
| 2026-08-05 | 97 BARCLAY STREET, Manhattan · 10007 | Structural remediation and reinforcement of deteriorated steel beam end connections and repairs at underside of deteriorated slab, at the 1st floor Loading dock and Parking area, a | $55,134 | › |
| 2026-08-04 | 97 BARCLAY STREET, Manhattan · 10007 | Removal of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily a | $70,000,000 | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.