Home › New York City, NY › Permit
Plumbing permit at 1633 BROADWAY, Manhattan
Plumbing
Contractor on record: ABCO-PEERLESS SPRKLR CORP
Named on this permit by NYC Open Data (DOB NOW) · 106 permits tracked since 2026-07-27 · $28,744,011 total declared value.
View full contractor profile →Work description
Existing sprinkler heads in lobby area to be replaced and relocated. New sprinkler heads added in lobby expansion. Plumbing work to include outdoor canopy upgrade & storm drainage.
More from ABCO-PEERLESS SPRKLR CORP
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-16 | 9 WEST 57 STREET, Manhattan · 10019 | SPRINKLER MODIFICATIONS TAKING PLACE ON 49TH FLOOR CONSTRUCTION (50TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $55,044 | › |
| 2026-11-13 | 825 THIRD AVENUE, Manhattan · 10022 | Addition of (2) fire hose valves to existing standpipe system. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Remodeling | $30,000 | › |
| 2026-11-13 | 825 THIRD AVENUE, Manhattan · 10022 | Addition of (1) fire hose valves to existing standpipe system. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Remodeling | $15,000 | › |
| 2026-11-12 | 1250 AVENUE OF THE AMERICAS, Manhattan · 10112 | SPRINKLER MODIFICATIONS ON THE 9TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $16,000 | › |
| 2026-11-12 | 9 WEST 57 STREET, Manhattan · 10019 | SPRINKLER MODIFICATIONS TAKING PLACE ON 49TH FLOOR CONSTRUCTION (50TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $65,043 | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-12 | 1633 BROADWAY, Manhattan · 10019 | HEAVY DUTY SIDEWALK SHED DURING EXTERIOR WORK FILED UNDER APPLICATION # M01365247. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER | $8,000 | › |
| 2026-11-04 | 1633 BROADWAY, Manhattan · 10019 | New and replaced plumbing fixtures. Relocation of existing storm piping. New sprinkler heads. 4 new first hose cabinets. No change to use,egress, or occupancy. Plumbing | — | › |
| 2026-10-26 | 1633 BROADWAY, Manhattan · 10019 | Replaced and new plumbing fixtures, removal of temp heads, addition of new sprinkler heads and preaction, and new fire hose cabinets. No change to use, egress, or occupancy. PlumbingRemodeling | $74,500 | › |
| 2026-10-16 | 1633 BROADWAY, Manhattan · 10019 | Plumbing work as shown on plans filed herewith. Plumbing | $20,000 | › |
| 2026-10-05 | 1633 BROADWAY, Manhattan · 10019 | Fit out of one floor with new ductwork and air conditioning units. No change to use, egress, or occupancy. HVAC | — | › |
| 2026-10-05 | 1633 BROADWAY, Manhattan · 10019 | INTERIOR ALTERATION WITH STRUCTURAL STEEL MODIFICATIONS, REINFORCING, NEW STEEL CONNECTIONS, WELDING/BOLTING, CONCRETE WORK, SELECTIVE DEMOLITION, CUTTING/CORE DRILLING, AND TEMPOR RemodelingDemolitionFoundation | — | › |
| 2026-10-05 | 1633 BROADWAY, Manhattan · 10019 | Fit out of three floors with new ductwork and air conditioning units. No change to use, egress, or occupancy. HVAC | $1,643,209 | › |
| 2026-10-02 | 1633 BROADWAY, Manhattan · 10019 | Interior fit out of the 15th Floor. No change to use, egress, or occupancy. | $6,495,054 | › |
| 2026-10-02 | 1633 BROADWAY, Manhattan · 10019 | Interior fit out of the 13th, 14th, and 16th Floors. No change to use, egress, or occupancy | $19,475,072 | › |
| 2026-10-01 | 1633 BROADWAY, Manhattan · 10019 | Structural alterations in connection with interior renovation, including selective demolition, structural steel modifications/reinforcing, new connections and attachments, and asso RemodelingDemolitionFoundation | $225,000 | › |
| 2026-09-29 | 1633 BROADWAY, Manhattan · 10019 | Minor demolition with installation of new rated walls and door for creation of ATS room in the sub-cellar 1 as per plans. No change to use, egress or occupancy. Demolition | $35,000 | › |
| 2026-09-29 | 1633 BROADWAY, Manhattan · 10019 | Installation of new sprinkler system on the 22nd floor (Newrez) as per plans. No change to use, egress or occupancy. | $93,304 | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.