Home › New York City, NY › Permit
Building permit at 595 MADISON AVENUE, Manhattan
Contractor on record: ALLSTATE SPRINKLER LLC
Named on this permit by NYC Open Data (DOB NOW) · 28 permits tracked since 2026-07-27 · $936,808 total declared value.
View full contractor profile →Work description
Sprinkler work on the 7th floor (Briony Raymond) as indicated on drawings.
More from ALLSTATE SPRINKLER LLC
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-13 | 155 WEST 29 STREET, Manhattan · 10001 | Cut back existing sprinkler heads serving lower storage units that are no longer needed. Cut and Cap piping only. No new sprinkler heads or piping to be installed. | $30,000 | › |
| 2026-11-12 | 5 CHATHAM SQUARE, Manhattan · 10013 | Replace existing main and branch piping, install new piping and sprinkler heads for new tenant space. No change in use occupancy, or egress under this application | $38,500 | › |
| 2026-11-12 | 242 WEST 36 STREET, Manhattan · 10018 | SPRINKLER WORK TO 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $10,000 | › |
| 2026-11-10 | 13 EAST 30 STREET, Manhattan · 10016 | Install, relocate, replace and remove sprinkler heads on the 6th and 7th floor. Sprinkler Work. No change in use, occupancy or egress. | $13,000 | › |
| 2026-11-10 | 540 MADISON AVENUE, Manhattan · 10022 | Sprinkler modifications taking place on the 7th floor as per plans filed herewith. No change in use, egress or occupancy. | $1,199 | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-05 | 595 MADISON AVENUE, Manhattan · 10022 | Filing herewith for interior removal and installation of non load bearing partition, ceiling, doors and floors as per plans. No change to use, egress or occupancy. | $3,999,960 | › |
| 2026-11-04 | 595 MADISON AVENUE, Manhattan · 10022 | Structural work for the cooling tower railing extension on the 18th floor as indicated on drawings. Foundation | $50,537 | › |
| 2026-09-25 | 595 MADISON AVENUE, Manhattan · 10022 | Construction work on the 10th floor (Dubin & Co.) as indicated on drawings. | $2,099,443 | › |
| 2026-09-25 | 595 MADISON AVENUE, Manhattan · 10022 | Mechanical work on the 10th floor (Dublin & Co.) as indicated on drawings HVAC | $299,992 | › |
| 2026-09-10 | 595 MADISON AVENUE, Manhattan · 10022 | Construction work on the 13th floor (Edie Parker) as indicated on drawings. | $209,537 | › |
| 2026-09-10 | 595 MADISON AVENUE, Manhattan · 10022 | Plumbing work on the 13th floor (Edie Parker) as indicated on drawings. Plumbing | $19,000 | › |
| 2026-09-10 | 595 MADISON AVENUE, Manhattan · 10022 | Sprinkler work on the 13th floor (Edie Parker) as indicated on drawings. | $14,999 | › |
| 2026-09-09 | 595 MADISON AVENUE, Manhattan · 10022 | Mechanical work on the 13th floor (Edie Parker) as indicated on drawings. HVAC | $85,909 | › |
| 2026-08-27 | 595 MADISON AVENUE, Manhattan · 10022 | Plumbing work on the 21st floor (Marina B) as indicated on drawings. Plumbing | $15,500 | › |
| 2026-08-10 | 595 MADISON AVENUE, Manhattan · 10022 | Select facade repairs on all elevations and roof as indicated on drawings. Roofing | $3,396,352 | › |
| 2026-08-10 | 595 MADISON AVENUE, Manhattan · 10022 | INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT | — | › |
| 2026-08-10 | 595 MADISON AVENUE, Manhattan · 10022 | Interior demolition of non load bearing partitions on the 5th floor as indicated on drawings. Demolition | $32,240 | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.