Home › New York City, NY › Permit
Remodeling permit at 523 EAST 70 STREET, Manhattan
RemodelingFoundation
Work description
ANNEX ESR: STRUCTURAL MODIFICATIONS TO ACCOMMODATE ALTERATIONS AT SETBACK WITHIN THE EXISTING HOPITAL POWER BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-10-29 | 523 EAST 70 STREET, Manhattan · 10021 | Annex Fac: Facade alterations to accommodate LL11 work as per plans. No change to use, egress or occupancy. Remodeling | $4,495,218 | › |
| 2026-10-19 | 523 EAST 70 STREET, Manhattan · 10021 | ANNEX ESR: PLUMBING, SPRINKLER & STANDPIPE MODIFICATIONS TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOPITAL POWER BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. PlumbingRemodeling | $244,000 | › |
| 2026-09-23 | 523 EAST 70 STREET, Manhattan · 10021 | INSTALLATION OF A TEMPORARY MATERIAL HOIST SYSTEM AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. MATERIAL HOIST TO COMPLY WITH CHAPTER 33 OF HVAC | $10,000 | › |
| 2026-09-22 | 523 EAST 70 STREET, Manhattan · 10021 | INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF | $10,000 | › |
| 2026-09-22 | 523 EAST 70 STREET, Manhattan · 10021 | INSTALLATION OF TEMPORARY FENCE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION FENCE TO COMPLY WITH CHAPTER 33 OF NYC BUILDING C Fencing | $10,000 | › |
| 2026-08-31 | 523 EAST 70 STREET, Manhattan · 10021 | HEAVY DUTY SIDEWALK SHED REQUIRED FOR BLDG ALTERATION FILED SEPARATELY UNDER APP # M01239814. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR E Remodeling | $7,000 | › |
| 2026-08-31 | 523 EAST 70 STREET, Manhattan · 10021 | TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HVAC | $3,000 | › |
| 2026-08-25 | 523 EAST 70 STREET, Manhattan · 10021 | Annex Electrical Upgrade; remove existing stair and catwalk and replace with new metal pan stair in the same location; partitions and finishes to accommodate electrical upgrade in Electrical | $1,422,000 | › |
| 2026-08-25 | 523 EAST 70 STREET, Manhattan · 10021 | ANNEX ESR: MODIFICATION TO HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATION WITHIN THE EXISTING HOSPITAL POWER BUILDING AS PER PLANS. NO CHANGE TO UES, EGRESS OR OCCUPANCY HVACRemodeling | $1,080,000 | › |
| 2026-08-24 | 523 EAST 70 STREET, Manhattan · 10021 | EQUIPMENT USE: SINGLE 7000 # CAPACITY PERSONNEL HOIST DURING BLDG ALTERATION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER T HVACRemodeling | $10,000 | › |
| 2026-08-07 | 523 EAST 70 STREET, Manhattan · 10021 | ANNEX GAS: Plumbing modifications to accommodate new gas installation as indicated on plans filed herewith. Plumbing | $120,000 | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.