Home › New York City, NY › Permit
Building permit at 122 5 AVENUE, Manhattan
Contractor on record: ORBIT SPRINKLER CORP
Named on this permit by NYC Open Data (DOB NOW) · 27 permits tracked since 2026-07-27 · $1,195,676 total declared value.
View full contractor profile →Work description
Modifications to an existing sprinkler/standpipe system.
More from ORBIT SPRINKLER CORP
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-09 | 1619 BROADWAY, Manhattan · 10019 | INTERIOR RENOVATION OF EXISTING OFFICE SPACE ON THE 4TH FLOOR. MODIFICATION OF EXISTING SPRINKLER SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. Remodeling | $38,451 | › |
| 2026-11-05 | 27 BLEECKER STREET, Manhattan · 10012 | installation of sprinkler fixtures along with related piping. | $28,000 | › |
| 2026-11-04 | 36 PERRY STREET, Manhattan · 10014 | SPRINKLER INSTALLATION IN CONJUNCTION WITH RENOVATION AND BUILDING ADDITION FOR 1-FAMILY RESIDENCE. FULLY SPRINKLER THE BUILDING. INSTALL SPRINKLER HEADS AND PIPING. SPRINKER WATER Remodeling | $45,750 | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-09-29 | 122 5 AVENUE, Manhattan · 10011 | Installation of full floor sprinkler coverage and relocate an auxiliary fire hose valve and to connect to existing base building combined sprinkler/standpipe system. No change in u | $110,985 | › |
| 2026-09-24 | 122 5 AVENUE, Manhattan · 10011 | Interior tenant build-out on the 6th floor to include new plumbing fixtures and related piping. No change in use, egress or occupancy under this application. Plumbing | $63,350 | › |
| 2026-09-21 | 122 5 AVENUE, Manhattan · 10011 | Sprinkler Modifications on 2nd Floor as indicated on plans filed herewith | $110,000 | › |
| 2026-09-18 | 122 5 AVENUE, Manhattan · 10011 | Plumbing modifications on 2nd floor as indicated on plans filed herewith. Plumbing | $65,000 | › |
| 2026-09-17 | 122 5 AVENUE, Manhattan · 10011 | Mechanical modifications on 2nd Floor as indicated on plans filed herewith HVAC | $655,000 | › |
| 2026-09-16 | 122 5 AVENUE, Manhattan · 10011 | Interior tenant build-out on the 6th floor including installation of new HVAC system and related ductwork/piping. No change in use, egress, or occupancy under this application. HVAC | $601,160 | › |
| 2026-09-15 | 122 5 AVENUE, Manhattan · 10011 | Interior tenant build-out on 6th floor including installation of non-load bearing partitions, doors/frames, and related finishes. No change in use, egress or occupancy under this a | $2,939,475 | › |
| 2026-09-03 | 122 5 AVENUE, Manhattan · 10011 | Plumbing work associated with new commercial chilled tubs and new commercial sauna as shown on plans. Plumbing | $200,000 | › |
| 2026-08-31 | 122 5 AVENUE, Manhattan · 10011 | Interior office renovation on 2nd floor as indicated on plans filed herewith. No change of use, egress or occupancy. Remodeling | $1,868,539 | › |
Public record from NYC Open Data (DOB NOW). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.