Home › New Orleans, LA › Permit
Roofing permit at 2621 General Meyer Ave
RoofingHVACRemodeling
Work description
Floor 3 of a 3-story renovation. Install one (1) 2.5-ton heat pump split system including air handler, condensing unit on the roof, refrigerant piping, condensate piping, supply/return ductwork, outside air distribution, exhaust ductwork, controls, and associated mechanical accessories per plans.
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-02 | 2621 General Meyer Ave | - Install 3 dual pedestals on assigned spots, refer to building plans
- Install 6 Tesla UWC, 2 per pedestal Electrical | $17,513 | › |
| 2026-10-08 | 2621 General Meyer Ave | Installation of Two (2) Elevators | — | › |
Public record from City of New Orleans Open Data. Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
First Call: New Orleans hvac jobs with no contractor yet
Every morning, the new permits in your trade that name no contractor, by email or Slack. Save your ZIP codes once and we send only new matches.
Free during early access · No credit card