Electrical permit at 4024 S EASTMARK PKWY
Electrical
Work description
Install new equipment for a new public potable water well site. New 3/4-inch landscape water meter service and 3/4-inch water meter. New electrical 400A 3 phase meter. Deferred chlorine storage enclosure and acoustic enclosure. Special Inspections Required: steel construction, concrete construction, masonry construction, and wood construction. Results in CofC.
Public record from City of Mesa Open Data. Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.