Home › Washington, DC › Permit
Building permit at 1301 MARYLAND AVE SW, WASHINGTON, DC 20024
Contractor on record: NICHOL BREVIG
Named on this permit by DC Open Data (Dept. of Buildings) · 8 permits tracked since 2026-09-24.
View full contractor profile →Work description
CFA Furnish and install one (1) 2100# HydroFit elevator
More from NICHOL BREVIG
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-09 | 1250 MARYLAND AVE SW, WASHINGTON, DC 20024 | CFA 3500# Gen3 Peak Elevator, N1JP47, ELEV #1 | — | › |
| 2026-11-09 | 1250 MARYLAND AVE SW, WASHINGTON, DC 20024 | CFA 3500# Gen3 Peak Elevator, N1JP48, ELEV #2. | — | › |
| 2026-11-09 | 1250 MARYLAND AVE SW, WASHINGTON, DC 20024 | CFA 3500# Gen3 Peak Elevator, N1JP49, ELEV #3 | — | › |
| 2026-11-09 | 1250 MARYLAND AVE SW, WASHINGTON, DC 20024 | CFA 3500# Gen3 Peak Elevator, N1JP50, ELEV #4. | — | › |
| 2026-11-09 | 1250 MARYLAND AVE SW, WASHINGTON, DC 20024 | CFA 3500# Gen3 Edge Elevator, N1JP51, ELEV #7. | — | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-10-11 | 1301 MARYLAND AVE SW, WASHINGTON, DC 20024 | After-Hours permit for 10/12/2026 to continue construction activities for the 1301 MD Ave project site from 7AM to 5PM. | — | › |
| 2026-08-14 | 1301 MARYLAND AVE SW, WASHINGTON, DC 20024 | Electrical | — | › |
| 2026-08-06 | 1301 MARYLAND AVE SW, WASHINGTON, DC 20024 | Extended daily work hours to allow for the erection and installation of precast architectural concrete starting at 7PM and continuing through the following morning until 3AM. | — | › |
Public record from DC Open Data (Dept. of Buildings). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.