Home › Washington, DC › Permit
Roofing permit at 229 PENNSYLVANIA AVE SE, WASHINGTON, DC 20003
RoofingElectricalPlumbingHVACRemodeling
Work description
SCOPE OF WORK TO INCLUDE NEW REAR ADDITION TO 229/231 PENNSYLVANIA AVENUE SE WITH MODIFICATIONS TO THE EXISTING EXTERIOR REAR FACADES AND EXPANDING EXISTING OPENINGS IN THE PARTY WALL TO ALLOW FOR IMPROVED CONNECTIONS BETWEEN STRUCTURES. THE GROUND FLOOR WILL CONTAIN A RESTAURANT AND SUPPORTING COMMERCIAL KITCHEN, WITH KITCHEN PREP AND STORAGE SPACES LOCATED IN THE BASEMENT. SECOND AND THIRD FLOORS TO BE WARM LIT SHELLS WITH EGRESS, PLUMBING STUBS, AND SHAFTS FOR MEP AND KITCHEN EQUIPMENT AS REQUIRED. INTERIORS TO BE DESIGNED IN THE FUTURE AS A TENANT FIT OUT. THE RESTAURANT WILL CONTINUE TO ACROSS THE FIRST FLOOR TO THE ALLEY GARAGE AT 203 3RD STREET REAR. THE ALLEY GARAGE WILL CONTAIN TWO RESTROOMS AND A BAR, CONNECTING BACK TO THE 229/231 WITH AN ENCLOSED COURTYARD. SCOPE OF WORK TO INCLUDE NEW PARTITIONS, MILLWORK, CEILINGS, LIGHTING, FINISHES, FURNITURE, AND EQUIPMENT. NEW OPENINGS IN EXISTING FLOOR FOR EGRESS STAIRS AND ELEVATOR. SERVICE ELEVATOR AND OVERRUN LOCATED IN THE REAR ADDITION. SCOPE OF WORK TO INCLUDE NEW HVAC, PLUMBING AND ELECTRICAL WORK TO ACCOMPLISH NEW DESIGN. SCOPE OF WORK TO INCLUDE A NEW TERRACE ON AN EXISTING ROOF. EXISTING STRUCTURE TO REMAIN WHERE POSSIBLE AND BE REINFORCED TO ACCOMMODATE NEW EGRESS AND ELEVATOR SHAFTS.NEW FIRE ALARM AND SPRINKLER SYSTEM INCLUDED IN SCOPE OF WORK. EXISTING UTILITY INFRASTRUCTURE TO BE REUSED.
Public record from DC Open Data (Dept. of Buildings). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.