Home › Washington, DC › Permit
Building permit at 2250 8TH ST NW, WASHINGTON, DC 20001
Contractor on record: DFM PERMITS
Named on this permit by DC Open Data (Dept. of Buildings) · 117 permits tracked since 2026-07-27.
View full contractor profile →Work description
Afterhours for work at 2250 8th St NW. Monday through Saturdays, 5AM-7AM from November 2026 to December 2026. B2401838. Includes the erection of tower cranes to support the next phase of construction. ANC Support letter included with this application.
More from DFM PERMITS
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-13 | 1310 ELDER WALK NW, WASHINGTON, DC 20012 | 3 story townhome with buried basement level. | — | › |
| 2026-11-12 | 1155 CONNECTICUT AVE NW, WASHINGTON, DC 20036 | INTERIOR FIT OUT OF EXISTING OFFICE BUILDING. SCOPE OF WORK SHALL INCLUDE DEMOLITION OF NONSTRUCTURAL PARTITIONS AND OTHER ELEMENTS ON LEVEL 12 OF EXISTING OFFICE BUILDING INCLUDIN RemodelingDemolitionFoundation | — | › |
| 2026-11-10 | 3825 WISCONSIN AVE NW, WASHINGTON, DC 20016 | Afterhours permit for work at 3825 Wisconsin Ave NW for Veterans Day Holiday (11-11-2026) from 8:30AM-7PM. D2600344.Work Includes Interior demo and haul off for their schedule to b Demolition | — | › |
| 2026-11-10 | 2401 25TH ST SE, WASHINGTON, DC 20020 | Afterhours permit for 2401 25th St SE to allow contractor to work on Veterans Day Holiday, (11-11-2026) from 7AM-7PM. Building Permit B2502207. ANC Support is included with this re | — | › |
| 2026-11-09 | 1825 NEWTON ST NE, WASHINGTON, DC 20018 | Afterhours for work at 1825 Newton St NE. B2501086. 7AM-4PM. For Upcoming holidays, Veterans Day, 11/11/26, Martin Luther King Jr Day, 1/18/27, Presidents Day 2/15/27, Emancipation Roofing | — | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-09 | 2250 8TH ST NW, WASHINGTON, DC 20001 | Afterhours permit for work at 2250 8th St NW for Veterans Day Holiday, 11-11-2026. From 7AM-7PM. B2401838. ANC Support Letter included with this application. | — | › |
| 2026-11-09 | 2250 8TH ST NW, WASHINGTON, DC 20001 | Removal of one (1) found underground storage tank (UST) | — | › |
| 2026-10-28 | 2250 8TH ST NW, WASHINGTON, DC 20001 | Afterhours for work at 2250 8th St NW. Monday through Sundays, 7PM-7AM from October 28th, 2026, to November 28th, 2026, through December 2026. B2401838. For operation of a generato | — | › |
| 2026-10-28 | 2250 8TH ST NW, WASHINGTON, DC 20001 | Afterhours for work at 2250 8th St NW. Monday through Saturdays, 5PM-5AM from November 2026 to December 2026. B2401838. Includes Concrete Placement and Finishing. ANC Support lette | — | › |
| 2026-10-14 | 2250 8TH ST NW, WASHINGTON, DC 20001 | (1) 2x Wide Trailer Remodeling | — | › |
| 2026-10-14 | 2250 8TH ST NW, WASHINGTON, DC 20001 | — | › | |
| 2026-10-05 | 2250 8TH ST NW, WASHINGTON, DC 20001 | Two (2) tower crane for the construction of Howard University East Towers | — | › |
| 2026-09-10 | 2250 8TH ST NW, WASHINGTON, DC 20001 | Plumbing | — | › |
| 2026-08-27 | 2250 8TH ST NW, WASHINGTON, DC 20001 | Dewatering for subgrade construction | — | › |
| 2026-08-25 | 2250 8TH ST NW, WASHINGTON, DC 20001 | Electrical | — | › |
| 2026-08-24 | 2250 8TH ST NW, WASHINGTON, DC 20001 | Afterhours for work at 2250 8th St NW. Monday through Sundays, 7PM-7AM from August 2026 to September 2026, through December 2026. B2401838. For operation of a generator necessary t | — | › |
| 2026-08-24 | 2250 8TH ST NW, WASHINGTON, DC 20001 | Dewatering for subgrade construction | — | › |
Public record from DC Open Data (Dept. of Buildings). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.