Home › Chicago, IL › Permit
Electrical permit at 345 W FULLERTON PKWY
Electrical
Contractor on record: D.C.L. ELECTRIC
Named on this permit by City of Chicago Open Data · 76 permits tracked since 2026-07-27 · $16,671,900 total declared value.
View full contractor profile →Work description
LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 4 . LIGHTING OUTLETS: 6. SPECIFIC LOCATION: UNIT 2005.
More from D.C.L. ELECTRIC
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-18 | 2319 W CHARLESTON ST | ***SELF CERT - 2019 CBC - PROPOSED 2-STORY FRAME SINGLE FAMILYRESIDENCE W/BASEMENT AND ROOFTOP STAIR ENCLOSURE ANDROOFTOP DECK W/ PERGOLA, NEW REAR RAISED PATIO, NEW FRONTSTEPS, NE RoofingDecks & PatiosNew Construction | $950,000 | › |
| 2026-11-13 | 5507 W ADAMS ST | SPR 2019 CBC: FINISH THE BASEMENT OF THE EXISTING BUILDING TO CREATE AN ACCESSORY DWELLING UNIT (ADU) PER PLANS.THE PROPERTY CONTAINS A TWO-STORY EXISTING RESIDENTIAL BUILDING.THE RemodelingADUs | $22,500 | › |
| 2026-11-12 | 218 W KINZIE ST | SPR 2019 CHICAGO BUILDING CODE - REVISION TO PERMIT # 101069227 (INTERIOR RENOVATION OF EXISTING GROUP A-2 RESTAURANT IN EXISTING 5-STORY BUILDING WITH BASEMENT, GROUP A-2 RESTAUR Remodeling | $100,000 | › |
| 2026-11-06 | 7241 W TOUHY AVE | SPR 2019 CBRC: EXISTING B3-1 ZONED B USE OFFICE SPACE NONSTRUCTURAL INTERIOR ALTERATION TO PRIVATE OFFICES AND LIMITED COMMON SPACES IN 2 STORY OFFICE BUILDING, NEW FLOORING MATER Remodeling | $80,000 | › |
| 2026-11-06 | 8005 S RIDGELAND AVE | LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 44 . LIGHTING OUTLETS: 44. SPECIFIC LOCATION: THROUGHOUT THE WHOLE HOUSE. Electrical | $24,000 | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-12 | 345 W FULLERTON PKWY | LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 4 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: KITCHEN. ElectricalRemodeling | $2,340 | › |
| 2026-11-02 | 345 W FULLERTON PKWY | SCOPE: NONSTRUCTURAL INTERIOR ALTERATION IN KITCHEN INCLUDING ASSOCIATED ELECTRICAL AND PLUMBING. LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), UNIT 2501, 25TH FLOOR ElectricalPlumbingRemodeling | $10,000 | › |
| 2026-08-12 | 345 W FULLERTON PKWY | NONSTRUCTURAL INTERIOR REMODEL OF GUEST AND PRIMARY BATHROOMS INCLUDING ASSOCIATED ELECTRICAL AND PLUMBING. LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), UNIT 2706 ( ElectricalPlumbingRemodeling | $39,526 | › |
| 2026-08-12 | 345 W FULLERTON PKWY | SCOPE: NONSTRUCTURAL INTERIOR ALTERATION TO EXISTING PRIMARY BATHROOM AND GUEST BATHROOM ONLY INCLUDING ASSOCIATED ELECTRICAL AND PLUMBING. LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON- ElectricalPlumbingRemodeling | $90,760 | › |
Public record from City of Chicago Open Data. Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.