Home › Chicago, IL › Permit
Electrical permit at 5207 S HARPER AVE
ElectricalRemodeling
Work description
SC/ 2019 CBRC - INTERIOR ALTERATIONS ON FLOORS 3-11 FOR INSTALLATION OF ADDITIONAL ELECTRICAL SERVICE TO INCLUDE NEW CONDUIT AND EQUIPMENT, SWITCHBOARDS BUS DUCT, FEEDER CONNECTORS, SHUNT, TRIP BREAKERS AND FIRE DEPARTMENT EMERGENCY POWER OFF (EPO) AS PER PLANS. (OCCUPANCY GROUP B; TYPE 1A CONSTRUCTION)
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-06 | 5207 S HARPER AVE | SC 2019 CBC: INITIAL BUILDOUT ON THE 8TH FLOOR FOR A NON-HAZARDOUS LABORATORY SPACE. WORK INCLUDES NEW NON-LOAD BEARING PARTITIONS, DOORS, CEILINGS, MILLWORK AND FINISHES. WITH AS ElectricalPlumbingRemodeling | $500,000 | › |
| 2026-11-02 | 5207 S HARPER AVE | FIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101085835. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: | — | › |
| 2026-11-02 | 5207 S HARPER AVE | FIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101085835. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: | — | › |
| 2026-11-02 | 5207 S HARPER AVE | FIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101085836. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: | — | › |
| 2026-09-15 | 5207 S HARPER AVE | LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL DATA/VIDEO. SPECIFIC LOCATION: LAB FOR SCIENCES. Electrical | $150,000 | › |
| 2026-09-11 | 5207 S HARPER AVE | SELF-CERT 2019 CBC: REVISION TO PERMIT 101085095 REMOVING PREVIOUSLY PERMITTED SCOPE, EXCEPT FOR LIGHTING TO PREP SPACE FOR ANOTHER LABORATORY SPACE UNDER SEPARATE PERMIT OF A BUSI Remodeling | $1 | › |
| 2026-08-06 | 5207 S HARPER AVE | FIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101074867. AFFECTS: 0 DWELLING UNITS; 3 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: | — | › |
| 2026-07-27 | 5207 S HARPER AVE | SELF-CERT 2019 CBC: CORRIDOR AND CONFERENCE CENTER - PHASE 1 OF INITIAL BUILDOUT ON THE 8TH FLOOR WITHIN AN EXISTING MIXED-USE BUILDING FOR A NON-HASARDOUS LABORATORY SPACE. WORK ElectricalPlumbingRemodeling | $3,000,000 | › |
| 2026-07-27 | 5207 S HARPER AVE | SELF-CERT 2019 CBC: QUANTUM LAB WEST SIDE PHASE 2 OF INITIAL BUILDOUT ON THE 8TH FLOOR WITHIN AN EXISTING MIXED-USE BUILDING FOR A NON-HAZARDOUS LABORATORY SPACE. WORK INCLUDES NE ElectricalPlumbingRemodeling | $3,500,000 | › |
| 2026-07-27 | 5207 S HARPER AVE | SELF-CERT 2019 CBC: WET LAB EAST SIDE PHASE 3 OF INITIAL BUILDOUT ON THE 8TH FLOOR WITHIN AN EXISTING MIXED-USE BUILDING FOR A NON-HAZARDOUS LABORATORY SPACE. WORK INCLUDES NEW NON ElectricalPlumbingRemodeling | $3,500,000 | › |
Public record from City of Chicago Open Data. Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.