Home › Boston, MA › Permit
Electrical permit at 101 Huntington AV Boston
Electrical
Work description
Low Voltage Galaxy shall provide and install new access control reader packages and IP video cameras on the 21st floor, 24th floor and 25th floor. On the 21st floor, Galaxy shall install (2) 5mp dome cameras and (2) card reader package doors and a new Brivo 2-door panel, on the 24th floor, Galaxy shall install (2) new card reader packages and move (1) move existing card reader package to the newly installed door, on the 25th floor Galaxy shall install (5) card reader packages and swap (1) existing card reader to a new HID Signo reader with keypad, (5) new 5mp dome cameras. On the 24th floor, Galaxy shall install (1) new Brivo ACS6100 panel and expansion doors to accomodate new door packages and (1) new Eagle Eye Bridge and PoE switch for camera and megapixel expansion. Galaxy shall pull new composite multi conductor cable for all new access door locations as well as new CAT6 for all new IP cameras
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-09-02 | 101 Huntington AV Boston · 02199 | Fast Track Application Offices, School, Garage, Commercial, Daycare;Certificate for Offices - Floors 21, 22 &; 25ALT1897873 Issued 1/14/2026 | $2,677,856 | › |
| 2026-08-21 | 101 Huntington AV Boston · 02199 | Electrical Renovation Audax 21st Floor Restrooms consisting of new lighting upgrades. ElectricalRemodeling | $38,000 | › |
| 2026-08-14 | 101 Huntington AV Boston · 02199 | Low Voltage Network wiring for Audax on 21 and 25 Electrical | $9,500 | › |
Public record from Analyze Boston (City of Boston Open Data). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.