Home › Boston, MA › Permit
Electrical permit at 149 Thirteenth ST Charlestown
ElectricalRemodeling
Contractor on record: Shaun Mellett
Named on this permit by Analyze Boston (City of Boston Open Data) · 124 permits tracked since 2026-07-27 · $40,390,550 total declared value.
View full contractor profile →Work description
Electrical Renovation of MGH CNY building 149 MRI Bay #6
More from Shaun Mellett
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-06 | 188 Longwood AV Boston/Fenway/Kenmore/Audubo · 02115 | Electrical Replacement of 2 air handler units , 9 chilled heating hot water pumps will be replace and upgrades to basement electrical room demo. Two new air handler units to replac ElectricalDemolition | $500,000 | › |
| 2026-11-06 | 188 Longwood AV Boston/Fenway/Kenmore/Audubo · 02115 | Fire Alarm adding FA devices to existing loop Electrical | $7,450 | › |
| 2026-11-04 | 60 Fenwood RD Boston · 02115 | Electrical 4th floor outpatient multi-specialty clinic renovation (10) panelboards, (1) transformer ElectricalRemodeling | $1,200,000 | › |
| 2026-11-04 | 60 Fenwood RD Boston · 02115 | Electrical 3rd Floor Outpatient Infusion Center fitout and 4th floor Air handler serving pharmacy on 3rd floor. 1-800A ATS , 1-Switchboard, 15 Panels Electrical | $1,600,000 | › |
| 2026-11-04 | 500 Terminal RD East Boston · 02128 | Electrical TERMIANL E ARRIVALS DECK EXTENSION LIGHTING, DISTRIBUTION, BRANCH POWER, SIGNALLING SYSTEM ElectricalDecks & Patios | $2,000,000 | › |
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-03 | 149 Thirteenth ST Charlestown · 02129 | Fast Track Application Partition of Conference Room 5215 into two rooms: Fellows 5215.1 and Kitchenette 5215.2. New architectural finishes
E-FILE Remodeling | $180,000 | › |
| 2026-10-16 | 149 Thirteenth ST Charlestown · 02129 | Fire Alarm Remove and reinstall (1) smoke detector for construction Electrical | $500 | › |
| 2026-10-06 | 149 Thirteenth ST Charlestown · 02129 | Plumbing Renovation of lab for MGH PlumbingRemodeling | $120,000 | › |
| 2026-10-06 | 149 Thirteenth ST Charlestown · 02129 | Interior/Exterior Work Selective architectural renovation to existing MRI suite to replace magnets. Scope of work includes: demo, rough carpentry, millwork, glass window rmv/reinst ElectricalPlumbingHVACRemodelingDemolition | $710,910 | › |
| 2026-10-05 | 149 Thirteenth ST Charlestown · 02129 | Plumbing Demo existing lab gas piping and installing new CO2 and lab vacuum piping and needle turret ball valves. Install (1) new lab sink and water, lab waste & vent piping PlumbingDemolition | $49,100 | › |
| 2026-09-15 | 149 Thirteenth ST Charlestown · 02129 | Fast Track Application Offices, Lab(MGH), Retail &; Restaurant;;Certificate for Lab Space on the 5th floor;ALT 1826366 Issued 3/17/26 | $4,958,594 | › |
| 2026-09-15 | 149 Thirteenth ST Charlestown · 02129 | Fast Track Application Offices, Lab(MGH), Retail &; RestaurantCertificate for Lab - 5th FloorALT1827887 Issued 3/27/2026 &; SF1810984 Issued 1/14/2026 | $375,000 | › |
| 2026-09-02 | 149 Thirteenth ST Charlestown · 02129 | Low Voltage Installation of Cat6A data cabling for the new Yun Lab area renovation 5th Floor. ElectricalRemodeling | $48,000 | › |
| 2026-08-03 | 149 Thirteenth ST Charlestown · 02129 | Electrical Installation of new AHU, condensing unit, and exhaust fan on 2nd floor of mechanical space, fed from new electrical panel Electrical | $15,000 | › |
| 2026-08-03 | 149 Thirteenth ST Charlestown · 02129 | Fire Alarm Installation of duct smoke for AHU shutdown on 2nd floor of mechanical space Electrical | $3,000 | › |
Public record from Analyze Boston (City of Boston Open Data). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.