Home › Boston, MA › Permit
Electrical permit at 333 Terminal ST Charlestown
Electrical
Work description
Electrical Scope of work: Install (1) 40 amp 480 volt 3 phase circuit from the 2nd floor breakroom electrical panel to the designated paint booth bay. All wiring from the load side of the disconnect to the paint booth by other. Install (1) 40 amp 208 volt 3 phase circuit from the existing panel located in the paint booth bay to the MAU unit located outside of the existing garage door. Install (1) 3 phase outdoor rated fusible disconnect from the customer supplied MAU unit. Low voltage wiring is not included.
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-09-17 | 333 Terminal ST Charlestown · 02129 | Gas Install gas piping for furnace HVAC | $10,000 | › |
Public record from Analyze Boston (City of Boston Open Data). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.