Home › Boston, MA › Permit
Remodeling permit at 200 State ST Boston
Remodeling
Work description
Fast Track Application Selective removal of finishes to build out tenant space on the 6th floor for new conference rooms, wellness room, offices & kitchen,install all new finishes, upgrading mechanical systems, new & relocated sprinkler heads & fire alarm devices. Eplans
Property history
| Issued | Address | Work description | Est. value | |
|---|---|---|---|---|
| 2026-11-04 | 200 State ST Boston · 02109 | Fast Track Application Office, Retail, Restaurant 36A Hair salon, Bank, ATM Access Parking;Certificate for Common Areas on the 11th floor.ALT 1861230 Issued 7/31/26, SF 1860453 Iss | $430,116 | › |
| 2026-11-04 | 200 State ST Boston · 02109 | Fast Track Application Office, Retail, Restaurant 36A Hair salon, Bank, ATM Access Parking;Certificate For Common Areas On The 8Th Floor;ALT-1861294 Issued 07/31/2026, SF-1860437 I | $430,116 | › |
| 2026-10-20 | 200 State ST Boston · 02109 | Electrical HVAC CONTROL WIRING ON THE 6TH FLOOR ElectricalHVAC | $3,500 | › |
| 2026-10-14 | 200 State ST Boston · 02109 | Low Voltage Installation of 102 cat6 cables Electrical | $17,000 | › |
| 2026-09-28 | 200 State ST Boston · 02109 | Electrical Electrical scope associated with tenant renovations located on level 06 of 200 State Street. New receptacles, light fixtures, & lighting controls to be installed through ElectricalRemodeling | $106,000 | › |
| 2026-09-28 | 200 State ST Boston · 02109 | Fire Alarm Fire alarms scope associated with tenant renovations on level 06 of 200 State Street, per engineered drawings.
New devices & wiring to be installed, tied to existing sy ElectricalRemodeling | $13,000 | › |
| 2026-09-15 | 200 State ST Boston · 02109 | Low Voltage Installation of structured cabling and sound masking systems Electrical | $80,000 | › |
| 2026-09-09 | 200 State ST Boston · 02109 | Electrical HVAC CONTROL WIRING ON THE 11TH FLOOR ElectricalHVAC | $7,500 | › |
| 2026-09-04 | 200 State ST Boston · 02109 | Electrical Cozen O'Connor - Project #22058 - Install receptacle for dishwasher. Electrical | $2,000 | › |
| 2026-09-02 | 200 State ST Boston · 02109 | Fire Alarm Carr Properties - Project 21750 - Install new smoke detection for stairwells for common area project on 11th floor Electrical | $10,000 | › |
| 2026-09-02 | 200 State ST Boston · 02109 | Low Voltage 41 telecom drops on the 6th floor of 200 State St for tenant Huron CZ-267425 Electrical | $10,714 | › |
| 2026-08-27 | 200 State ST Boston · 02109 | Electrical Carr Properties - Project 21750 - Renovation of existing common corridors on 11th floor with new lighting and misc power ElectricalRemodeling | $110,000 | › |
Public record from Analyze Boston (City of Boston Open Data). Owner name and contact details are not part of this open-data feed unless shown above. Verify details before use.
Get these leads in your inbox — free
One email a week with the newest permits for your trade and area. Tell us what you cover and we'll filter it for you. Unsubscribe anytime.